A short history of CAD in architecture, from light pens to BIM

The history of CAD in architecture runs from interactive drawing on a screen in the early 1960s, through shared mainframe systems and affordable PC drafting in the 1980s, to solid modelling, object-based building models and visual scripting. Each stage changed what an architect's file holds, from lines on layers to objects carrying data.

Tektronix 4014 storage-tube terminal from 1974 showing a green wireframe 3D surface plot
Tektronix 4014 storage-tube terminal from 1974 showing a green wireframe 3D surface plot. Photo: Thomas Amberg, CC BY-SA 2.0

Sketchpad and the first interactive drawing

Computers were preparing punched-tape instructions for numerically controlled milling machines in the 1950s, but the program usually credited with interactive drawing on a screen is Sketchpad, written by Ivan Sutherland in 1963. A user drew lines and arcs with a light pen, zoomed in and out, and set constraints such as two lines staying parallel, which the program kept true during edits.

Sketchpad also used master drawings and instances: change the master and every copy updated, the idea behind blocks and families in later software. In the same decade Pierre Bézier, an engineer in the French car industry, made public the curves named after him, which still sit behind the pen tool of most drawing programs. An engineer at a rival car maker had worked out the same curves a few years earlier, but that work was kept confidential.

What a CAD file holds, 1960s to 2010s Timeline from the 1960s to the 2010s with five stations showing what a file holds: a line drawn with a light pen, a plan on a storage-tube screen, a drawing on layers, a solid model with a hole cut out, and a wall object carrying a property tag. Light pen Layers Property tag 1960s 1970s 1980s 1990s 2000s 2010s
Fig. 15 What a CAD file holds, 1960s to 2010s

Mainframe building systems in the 1970s

Through the 1970s, CAD ran on mainframes and minicomputers far too costly for a small practice, and users shared terminals and booked machine time. Many terminals had storage-tube displays: a drawn line stayed glowing, but deleting one line meant clearing the screen and redrawing the rest. Pen plotters put the result on paper or film.

A few building systems of the period already stored components such as walls and rooms with attributes, and produced drawings and schedules from them. They suited large organisations whose buildings repeated the same parts. Academic research on describing buildings as data grew alongside them, shared through specialist conferences on computing in design.

Pen carriage of a 1960s drum plotter on museum display, with a red wireframe teapot plotted on the paper
Pen carriage of a 1960s drum plotter on museum display, with a red wireframe teapot plotted on the paper. Photo: Ryan Somma, CC BY-SA 2.0

PC drafting in the 1980s

AutoCAD, released in 1982, ran on personal computers and put 2D drafting within reach of small practices. The file was an electronic drawing board: lines, arcs, text and hatching on layers, with no idea of what a wall was. Plots still came off pen plotters, so a line's colour decided which pen drew it, and offices kept tables linking colours to line weights.

Two failures from that period still happen. A consultant who ignores the layer and colour convention sends drawings that plot with the wrong weights, and a detail drawn in millimetres inserted into a plan drawn in metres arrives a thousand times too large. In the same decade ArchiCAD, sold for the Apple Macintosh, already modelled a building as walls, slabs and roofs.

Solid and surface modelling

Mechanical engineering supplied 3D modelling. Constructive solid geometry builds shapes by adding, subtracting and intersecting boxes, cylinders and other primitives; boundary representation stores the faces, edges and vertices that enclose a volume, and most modelling software uses it underneath. In the late 1980s mechanical CAD added parametric, feature-based solids, where a hole or a fillet keeps editable dimensions.

Free-form surfaces moved from Bézier curves to NURBS, which describe both free curves and exact circles. Rhino, first released in 1998, brought NURBS modelling to architects on ordinary Windows PCs.

Object-based building models and visual scripting

Revit, first released in 2000, was built around parametric relationships between elements: move a wall and its doors move with it, and every view updates. The term building information modelling came into wide use in the early 2000s. The open IFC exchange format became an international standard, ISO 16739, in 2013.

Scripting changed form as well. AutoCAD gained AutoLISP, a built-in Lisp dialect, in the mid-1980s. Grasshopper, a visual programming plug-in for Rhino, appeared in the late 2000s, and Dynamo later did the same for Revit: components wired on a canvas form a parametric definition that regenerates geometry when an input changes.

Worked exampleOne terrace house through each generation of tools

Hypothetical project. A small practice designs the same two-storey terrace house at several points in the history of CAD. Each step shows what its file holds.

  1. 01

    1980s PC drafting: plans, sections and elevations are separate files of lines, so moving a window means editing every drawing and checking that none was missed.

  2. 02

    1990s 3D modelling: a solid model gives renders and a sun study, but it is not linked to the plans, so the two drift apart.

  3. 03

    2000s object model: walls and windows are objects, the window schedule counts itself, and moving one window updates every view.

  4. 04

    IFC export: the structural engineer receives walls whose Pset_WallCommon property set carries LoadBearing, IsExternal and FireRating values.

  5. 05

    Visual script: a Grasshopper definition places windows by rules for plot width and daylight, and regenerates them when the plot changes.

Where it falls short

  • Firsts are often disputed and many systems are left out here; only dates that are well established are given.
  • Files from early systems may no longer open without the original software, a real problem when buildings outlive their design tools.
  • Adoption was uneven: many small practices drew by hand long after large firms had CAD, and much work is still delivered as 2D drawings.

Key terms

Light pen
A pen-shaped sensor pointed at a display screen to select and draw, used by early interactive drawing systems such as Sketchpad.
Storage-tube display
An early screen on which drawn lines stayed visible without refreshing. Removing one line meant clearing and redrawing the whole image.
Pen plotter
A machine that draws vector lines on paper or film with pens. Line weight came from the pen chosen, often mapped to the line's colour in the file.
Constructive solid geometry
A way of modelling solids by adding, subtracting and intersecting simple shapes such as boxes, cylinders and spheres.
Boundary representation
A way of modelling a solid by storing the faces, edges and vertices of its surface. Most modelling software works this way underneath.
NURBS
Non-uniform rational B-splines: a mathematical description of curves and surfaces that handles both free forms and exact circles.

All 86 terms in the glossary

Questions

What was the first CAD program?

Sketchpad, written by Ivan Sutherland in 1963, is the program most often named, because it let a person draw and edit directly on a screen. Earlier systems programmed numerically controlled machines but were not interactive drawing tools. The answer depends on how CAD is defined.

When did architects start using CAD?

Large firms and organisations first used CAD on shared mainframe and minicomputer systems in the 1970s. Use spread after personal computers and AutoCAD arrived in the 1980s, and through the 1990s CAD replaced the drawing board in more and more offices.

What is the difference between CAD and BIM?

Drafting CAD stores geometry: lines, arcs and text that a person reads as a wall or a door. BIM stores building elements as objects with properties, so a wall knows its type, layers and fire rating, and drawings and schedules are generated from the model. Most BIM tools still include a 2D drafting engine for details.