What is BIM? Building information modelling in plain words

BIM (building information modelling) is a way of designing and managing a building as a shared model made of objects, such as walls and doors, that carry data as well as shape. Plans, sections and schedules become views of that one model, so a change made once appears everywhere it is shown.

Steel frame of a large building under construction, beams and columns against the sky
Steel frame of a large building under construction, beams and columns against the sky. Photo: hannibal1107, CC BY 2.0

Objects with properties instead of lines

In a two-dimensional CAD drawing, a wall is a pair of parallel lines, and the software has no idea they form a wall. In a BIM authoring tool you place a wall object instead. It has a type, a thickness, layers of material, a height tied to the floor levels and properties such as its fire rating and whether it is load-bearing.

A door object knows which wall hosts it and which room it opens into, so the door schedule is a filtered list of the model and nobody retypes it. Exchanged in the open IFC format, the door's rating travels as the property FireRating in the property set Pset_DoorCommon, a name any compliant program can read.

Cavity wall under construction: aerated concrete inner leaf, mineral wool insulation and concrete block outer leaf
Cavity wall under construction: aerated concrete inner leaf, mineral wool insulation and concrete block outer leaf. Photo: Kolforn, CC BY-SA 4.0, cropped

One model, many views

Drawings in BIM are views cut through the model: a plan is a horizontal cut, a section a vertical one, and a schedule a table of objects filtered by category. Move a wall and every view that shows it updates, along with the room areas on either side. A section can no longer show a window that the plan deleted two revisions ago.

The same model can feed a quantity take-off or a daylight and energy simulation, if it was built with that use in mind. An energy model needs rooms whose walls, floors and roofs meet, so that each volume closes.

One wall object, four views A single BIM wall object in the centre with arrows to four views generated from it: a plan, a section, a door schedule and a property panel listing its type, thickness, FireRating and IsExternal. Plan Section Door schedule Properties Type Thickness FireRating IsExternal Wall object
Fig. 1 One wall object, four views

What is BIM used for in design, construction and operation

During design, the architect, structural engineer and services engineer each build a discipline model. These are shared at agreed points and combined to check that the parts fit, a process known as clash detection.

Contractors use the models to plan the order of work and take off quantities, and steelwork or ductwork subcontractors often replace design objects with fabrication models of their own. At handover the client should receive the information for its asset information model, such as the equipment to maintain with manufacturer and warranty details, often as a COBie spreadsheet.

Levels of detail and levels of information

Early in design a wall may be one generic layer of roughly the right thickness; by construction it carries the real build-up. Numbered LOD scales such as LOD 100, 200 and 300 describe this progression, but LOD means level of development in some places and level of detail in others, so check which one a contract uses.

ISO 19650 avoids fixed numbers and asks the client for a level of information need per purpose: how much geometry, how much alphanumerical data and which documents, at which stage. A fire engineer reviewing compartments needs reliable fire ratings on walls and doors long before anyone needs the profile of a skirting board.

ISO 19650 in plain words

ISO 19650 is an international series of standards on how information about a building is requested, produced, checked and handed over when BIM is used. Part 1 sets out the concepts, Part 2 covers design and construction, and Part 3 covers the building in operation. It names no software.

The client, called the appointing party, states what it needs in exchange information requirements, and the delivery team answers with a BIM execution plan. Files sit in a common data environment and move through the states work in progress, shared, published and archived; construction should use only approved, published information.

Worked exampleDoor and room data for a small health centre

Hypothetical project. A two-storey health centre has around twenty consulting rooms, and the client's information requirements ask for every door's fire rating and every room's floor finish at handover.

  1. 01

    At concept stage the architect models rooms as named, numbered spaces and walls as generic types, leaving finishes out while the layout still moves.

  2. 02

    At technical design, real wall types replace the generic ones, with fire ratings set as type properties so walls of one type cannot drift apart.

  3. 03

    A checking rule lists every door in a fire-rated wall whose own rating is lower or empty. The first run finds several doors still carrying the template's empty default.

  4. 04

    Floor finishes become a room property. When a corridor is widened, its area and the finish quantity update without anyone measuring again.

  5. 05

    Before handover the contractor updates the model to what was built, including doors changed on site, and exports the door and room data.

Where it falls short

  • A wall can look right in 3D while carrying an empty fire rating, and nothing warns you unless someone has written a check for it.
  • Authoring tools store and export information differently, so data that behaves well inside one program can lose meaning outside it.
  • Keeping the model in step with site changes takes effort, and many handover models still describe the design more closely than the finished building.
  • On a small project a detailed model can cost more to build than it saves when nobody has agreed what each piece of information is for.

Key terms

Building information modelling (BIM)
Designing and managing a building through a shared model of objects that carry both shape and data, with drawings produced as views of it.
Authoring tool
Software in which a discipline builds and edits its model, as opposed to software used only to view, combine or check models.
Level of information need
The ISO 19650 way of stating how much geometry, alphanumerical data and documentation is needed for a given purpose at a given stage.
Common data environment (CDE)
The agreed system where project information is stored, with each file moving through work in progress, shared, published and archived states.
Exchange information requirements (EIR)
The client's statement of what information it needs from the delivery team, in what form and at which stages.

All 86 terms in the glossary

Questions

Is BIM a piece of software?

No. BIM is a way of working with a shared model, and programs such as Revit and Archicad are the tools used to build it. Two teams on the same software can follow very different processes, while teams on different software can still work together through open formats.

What is the difference between 3D CAD and BIM?

3D CAD describes shape: surfaces and solids with no record of what they represent. A BIM object knows that it is a door, which wall hosts it and what its fire rating is, so it can be scheduled and checked like any other data.

Does a small project need BIM?

Not necessarily to the full extent of ISO 19650. Many small practices use BIM authoring tools simply because the drawings stay consistent with each other. The formal process pays off when several organisations exchange information and the client needs reliable data at handover.